It had all started so well. ICE 1609 reached Berlin-Gesundbrunnen on time, and hardly anyone boarded at Berlin Central Station either. A real ghost train, with plenty of seats to choose from. That would at least make the almost seven hours (!!!) to Munich bearable – bear in mind that the distance is only 580 kilometres and the ICE is a high-speed train with exorbitant fares. But I was celebrating too soon. Everything went smoothly as far as Leipzig. Then, just beyond Leipzig, came the first “unscheduled” stop in the middle of nowhere. Track works. Lovely. The first five minutes of delay were in the bag. A short while later, somewhere in the Thuringian countryside, the train suddenly braked hard. Problems with the motor coach. After a system restart, including a power outage, we continued. Delay so far: ten minutes. Shortly before arriving at Lichtenfels station, the same thing happened again. Sudden braking, nothing worked. Fifteen minutes late. On entering Erlangen station, another sudden stop and system failure. That was the end of it. From Erlangen, we travelled towards Nuremberg at just 50 km/h. Shortly before entering Nuremberg station, what a surprise, another “unscheduled” stop. We were now more than 30 minutes late. When we arrived in Nuremberg, it was complete chaos. Passengers were leaving the train in a panic, with no information whatsoever about what would happen next or whether the journey would continue at all. Eventually, we did set off again, but nobody bothered to announce it. In the end, we reached our destination, more than half an hour late. Annoying enough. But the return journey was going to be even worse. On Friday afternoon, the ICE was packed to bursting. The only place I could sit was in the space between carriages. That would not have been quite so dramatic if the air conditioning had not also failed. After 20 minutes, I was already sticking to the floor. I had to change trains in Nuremberg. The connecting ICE was cancelled. A replacement train arrived as an IC. But this supposed IC turned out to be a battered regional express travelling at a slightly higher speed. It was well over 40 degrees inside the carriage, and there was no air conditioning at all. Selling something like that as an IC is an absolute disgrace. Even with the window open, the temperature was unbearable. There was no passenger information either. In Jena, I had to get off the train because I was on the verge of dehydration. There were no drinks available on this “IC”, either. In Jena, I took the next ICE an hour later. But even on that train, the air conditioning was not working in some carriages. Train staff evacuated those compartments. Passengers squeezed into the carriages where the air conditioning still worked. In some carriages, the public-address system had also failed. A never-ending nightmare. I reached Berlin more than 120 minutes late. In total, the 1,120-kilometre journey took me over 18 hours. Unbelievable and unacceptable in this day and age, especially at that price. After such a “positive” experience with Deutsche Bahn, I will avoid travelling south with this company in future. Either I will fly, or the trip will not happen. I would rather spend a few hours waiting in an air-conditioned airport than go through an ordeal like that on Deutsche Bahn.
Deutsche Bahn Nightmare – Part 5
- Details
- Hendrik Lorenz
- Category: Blog
- Read Time: 4 mins
- Hits: 6205
0.0 of 5 (0 Votes)
Add comment